How do you do,Welcome to visit jiangsu UFO high engineering co., LTD's official website!Chinese version | The English version
 Technical support hotline:
137-0510-3123
Join in cooperation
Service project
SERVICES ITEM
Wind power generation
The beautification of the chimney
Coal conveying belt dustproof cover
Fireproof plugging project
High altitude(Special)The engineering quality hosting
Chemical anchoring engineering
Rectifying building reinforcement engineering
Floor anticorrosion engineering
Desulfurizing chimney anti-corrosion engineering
Flood protection project
Air cleaning project
High altitude demolition project
High altitude installation project
High maintenance
High altitude construction engineering
Equipment steel corrosion engineering
FRP chimney
Equipment without feet hand heat preservation and repair
Hot is recommended
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Click to view:Coloured drawing or pattern the details of the chimney
The chimney coloured drawing or pattern
 
Understanding we can more trust flying saucer
With high quality technology、Perfect management、Advanced equipment,For the domestic and foreign customers to provide quality security services
  Jiangsu UFO high engineering co., LTD., founded in the early eighty s,The specialty is engaged in the special industry、Corrosion protection、Insulation construction enterprise,After dozens of years of development,Has now become the leadership、Strong technical force、Construction team、Advanced management level、Rich resources of modern enterprises,Enterprise credit and construction of power are in the same industry in a higher position。
  At present,The company has six branch、Twelve)、More than 20 overseas offices,The company set up the department completely accords with the requirements of modern enterprise,A total of employees1108People,Have all kinds of professional and technical titles112People,The engineer、Economist、Accountants18People,The project manager20People,Owned large and medium-sized machinery and equipment112Taiwan(A),Enterprise fixed assets over ten million yuan,Construction output value of nearly one hundred million yuan...
   
Company news          The dynamic of the industryMORE+  
It is important to note that the use of new professional team chimney
Although it is an electronic society,But as a traditional chimney facilities,But it still exists,Especially for large factories,Although there are many electronic heating、Electronic heating,But in terms of cost above,This method is still the most economical,So for the collective,Like this there are still exist in the form of chimney is necessary,It was also because of this,Some units or is now New project for collective there is still a chimney,But I am…
Technical newsMORE+  
Glass flake application process on the surface of the steel structure construction
A、Steel structure surface treatment construction specifications    For flake(Coatings)Application of steel structure equipment inside surface,Surface treatment to the surface of steel structure,Specific requirements are as follows:  1、Surface treatment 
80Meters of reinforced concrete chimney construction scheme
 A、 The construction method     The chimney overall arrangement of construction:Climbing equipment installation------Cylinder slippery rise-----Lined with masonry、The ladder、Platform、Electrical installation------Climbing equipment dismantled------Closed
Steel structure anticorrosion above can also be applied to the chimney construction
In fact in our life,At the time of production and construction,There are a lot of material,But people in the use of materials at the same time,Often there exists another phenomenon,Is its corrosion resistance,Although there is a big practical tend to have a lot of materials,But because of its lack of corrosion,So not only make it
How much should be adopted for a chimney when new wall height is appropriate
A new chimney wall height is60Mc25,Height80M-100Mc30。Weak corrosive flue gas chimney,Also USESc30。Flue gas for the medium and strong corrosion resistance,Should be used respectivelyc35Andc40。Basisc25。New cushion and aproll chimneyc15
Desulfurizing chimney construction method
Used on carbon steel base:   ①First the surface oil removal decontamination,Before cleaning,Descaling grade shall meet not less thanSa2.0OrSt3Standard。After the rust surface clean dry clean,To useVEGFResin base,After waiting for dry construction。   ②By hand trowel scraping the trowel1-2mm(Each
The new brick chimney
(A)、The new base:1、After the new brick chimney foundation pit dug basis should be determined(The center of the chimney)Set the center pile,Check jointly by construction unit and construction unit design of foundation pit center coordinates,The size of the base low and level meets the design requirements,When the ground is in line with the design
The chimney smoke baffle wall masonry construction
The chimney smoke baffle wall masonry construction The chimney smoke baffle wall elevation in12mThe following,The conventional construction method is adopted,Displacement and general building construction method of formwork platform is similar。Only the construction to the chimney displacement displacement template construction after the template。The chimney insulation layer、Lined with masonry chimney
Furnace frame anticorrosive construction scheme
Important form of construction:   The construction process  What preparations→Manual cleaning→The first line of primer→The name of the second primer→The first line of paint→The name of the second paint→The first chimney brush color ring→Brush the second chimney the color wheel→Check and accept  Important form of construction:  The chimney、Cooling tower ladder、To protect the network
New construction plan of concrete chimney
Thing is adopt built-in steel pipe industry shi derrick displacement mode build by laying bricks or stones construction technology,Is the promotion type built-in construction platform,Built-in vertical and plane.Vertical transportation system well.   Process the following:Process the following:     
120The engineering situation of meters artificial chimney demolition
A:Project summary:Two chimneys**Power plants12、13No waste materials processing projects(B)Block tower structure,Reinforced concrete structure,Height is120M,PointsABTwo,AIn the chimney13#The north side,BIn the chimney12#The north side,13#The south side of unit,AB
Quick navigation
Web site home page        Into the flying saucerCompany news       The dynamic of the industryProject presentation        Project performanceEnterprise qualification        Contact us
 
Product list
 
Scan the qr code to learn more
 
Copyright ? 2016 Jiangsu UFO high engineering co., LTD. All Rights Reserved For the record:SueICPTo prepare11066131Number-1 Technical support:Yancheng yancheng cisco network engineering co., LTD